British Army – Trenchard Lines – District Heating
McAndrew Martin were commissioned to undertake the following at Trenchard Lines.
District heating main – DHM Refurbishment
Design – Replacement of southern district heating network, utilising existing ducts where possible.
Design – Replacement of boilers and controls that services Southern district heating network.
Survey and enabling works to existing northern district heating network.
Carry out technical survey of services duct work and pipework condition.
Removal of sand from ducts and installation of pipework support brackets.
RIBA Stage 0-4 consultancy works and project duration of 7 months.
McAndrew Martin were commissioned to undertake the following at Trenchard Lines. District heating main – DHM Refurbishment Design – Replacement of southern district heating network, utilising existing ducts where possible. Design – Replacement of boilers and controls that services Southern district heating network. Survey and enabling works to existing northern district heating network. Carry out technical survey of services duct work and pipework condition. Removal of sand from ducts and installation of pipework support brackets. RIBA Stage 0-4 consultancy works and project duration of 7 months.