Logistic Centre – Bicester

McAndrew Martin were commissioned to investigate and propose a suitable low energy LED, long life replacement lighting & emergency lighting scheme that also conforms to current standards and regulations in terms of operating lux levels for the 15,000 Square metre logistic centre.

The involved carrying out surveys of the existing building including lux levels during both day and night time hours of darkness and energy monitoring. This was part of a site wide initiative in ‘spend to save’ on energy.

Prior to the scheduled replacement of the existing SON lights remote power monitoring equipment was installed to provide data of the electrical loadings on a 24 hour basis, as the building ran a mission critical 24-7 operation. This was repeated after the install to confirm the power and carbon emissions savings to be made in the future.

One of the major challenges was installing the new high bay lights at a height of 6 metres to produce lighting levels which met the guidelines for a warehouse lighting environment.

Selective positioning for all the lights was essential to avoid glare for forklift (reach truck) operators, and to provide for areas of task lighting. The installation of PIR sensors that activate the light at this height was also something that has to be overcome.

McAndrew Martin were commissioned to investigate and propose a suitable low energy LED, long life replacement lighting & emergency lighting scheme that also conforms to current standards and regulations in terms of operating lux levels for the 15,000 Square metre logistic centre. The involved carrying out surveys of the existing building including lux levels during both day and night time hours of darkness and energy monitoring. This was part of a site wide initiative in ‘spend to save’ on energy. Prior to the scheduled replacement of the existing SON lights remote power monitoring equipment was installed to provide data of the electrical loadings on a 24 hour basis, as the building ran a mission critical 24-7 operation. This was repeated after the install to confirm the power and carbon emissions savings to be made in the future. One of the major challenges was installing the new high bay lights at a height of 6 metres to produce lighting levels which met the guidelines for a warehouse lighting environment. Selective positioning for all the lights was essential to avoid glare for forklift (reach truck) operators, and to provide for areas of task lighting. The installation of PIR sensors that activate the light at this height was also something that has to be overcome.

British Army – Trenchard Lines – District Heating

McAndrew Martin were commissioned to undertake the foll…

M&E Fire Suppression & Prevention Systems – HM Gov

McAndrewMartin has designed and project managed a numbe…

M&E Roof Chillers – Temple Quay House, Bristol

Interserve commissioned McAndrewMartin to evaluate the…

Whitehall FCO – Café upgrade

Proposed upgrade for Café in Foreign and Commonwealth o…

HM Gov – Security Work

McAndrew Martin Ltd have extensive experience and exper…

DMS Whittington – Improved Security at Main Gate

DMS Whittington is a tri- service training establishmen…

High Security – HM GOV & Private Sector Clients

CDM 2015 H&S regulations are discharged through our…

South East Reserve Forces & Cadet Association (SERFCA) – Multi Faith Centre

McAndrewMartin were awarded the commission to create a…

Commercial Valuations – Kent House, Southsea

McAndrewMartin’s valuations team were commissioned by T…

Domestic Valuation, Listed Buildings, Survey’s, Planning, Improvements & more

McAndrewMartin have an extensive history and catalogue…

RAF Mildenhall – Refuelling Boom Hangar

USAF – RAF Mildenhall project to design and new hangar…

Ted Baker

As part of the developing relationship with MITIE and t…

Halberry Lodge – Earl Mountbatten Hospice, Isle of Wight

The works originated from a routine planned maintenance…

USAF in the UK with McAndrewMartin

McAndrewMartin have been commissioned for many projects…

CCG Accommodation – NHS – Basingstoke

McAndrew Martin were appointed by the NHS to undertake…

Leonardo Helicopters

Proposed Facility Management office for the Leonardo He…

Maritime Coast Guard Agency – Southampton

McAndrewMartin were commissioned to undertake feasibili…

Building Conservation – Park Building, Portsmouth

McAndrewMartin were commissioned to undertake a full bu…

Royal Palaces

McAndrew Martin were delighted to have been appointed t…

Sandhurst Military Academy

The Royal Military Academy, Sandhurst (RMAS) was formed…

DEFRA – Kingspool Car Park – York

McAndrewMartin were commissioned by the prime contracto…

Gate Guardian – RAF Northolt

McAndrewMartin to undertake RIBA Stages 0-4 in the prep…

Sandhurst Military Academy

The Royal Military Academy, Sandhurst (RMAS) was formed…

East Anglian Reserve Forces & Cadet Association (EARFCA) – New Accommodation Block

EARFCA – Waterbeach, Cambridgeshire new accommodation b…

Horse Guards – London

The Changing of the Guards is one of London’s top touri…

Dept for Transport Asset Validation Survey, UK South

McAndrew Martin were commissioned by the departments pr…