McAndrewMartin has designed and project managed a number of different fire suppression systems. These include gaseous fire suppression systems including
Carbon Dioxide (CO2),
FM-200
Novec 1230.
Inergen (argonite/nitrogen mix)
Oxygen depletion

McAndrewMartin have highly qualified engineers that coordinate with DFRMO / local fire authorities for design approval

McAndrewMartin are BAFE accredited to SP203 for design and verification of fire safety systems

Actual location details not permitted but one project with NOVEC 1230 was installed in a phased approach due to the location and sensitivity over a 12 month period.

McAndrewMartin has designed and project managed a number of different fire suppression systems. These include gaseous fire suppression systems including Carbon Dioxide (CO2), FM-200 Novec 1230. Inergen (argonite/nitrogen mix) Oxygen depletion McAndrewMartin have highly qualified engineers that coordinate with DFRMO / local fire authorities for design approval McAndrewMartin are BAFE accredited to SP203 for design and verification of fire safety systems Actual location details not permitted but one project with NOVEC 1230 was installed in a phased approach due to the location and sensitivity over a 12 month period.

Maritime Coast Guard Agency – Southampton

McAndrewMartin were commissioned to undertake feasibili…

British Army – Trenchard Lines – District Heating

McAndrew Martin were commissioned to undertake the foll…

Building Conservation – Park Building, Portsmouth

McAndrewMartin were commissioned to undertake a full bu…

CCG Accommodation – NHS – Basingstoke

McAndrew Martin were appointed by the NHS to undertake…

Commercial Valuations – Kent House, Southsea

McAndrewMartin’s valuations team were commissioned by T…

DEFRA – Kingspool Car Park – York

McAndrewMartin were commissioned by the prime contracto…

DMS Whittington – Improved Security at Main Gate

DMS Whittington is a tri- service training establishmen…

Gate Guardian – RAF Northolt

McAndrewMartin to undertake RIBA Stages 0-4 in the prep…

Halberry Lodge – Earl Mountbatten Hospice, Isle of Wight

The works originated from a routine planned maintenance…

High Security – HM GOV & Private Sector Clients

CDM 2015 H&S regulations are discharged through our…

HM Gov – Security Work

McAndrew Martin Ltd have extensive experience and exper…

Leonardo Helicopters

Proposed Facility Management office for the Leonardo He…

Logistic Centre – Bicester

McAndrew Martin were commissioned to investigate and pr…

M&E Roof Chillers – Temple Quay House, Bristol

Interserve commissioned McAndrewMartin to evaluate the…

RAF Mildenhall – Refuelling Boom Hangar

USAF – RAF Mildenhall project to design and new hangar…

Royal Palaces

McAndrew Martin were delighted to have been appointed t…

Sandhurst Military Academy

The Royal Military Academy, Sandhurst (RMAS) was formed…

Sandhurst Military Academy

The Royal Military Academy, Sandhurst (RMAS) was formed…

South East Reserve Forces & Cadet Association (SERFCA) – Multi Faith Centre

McAndrewMartin were awarded the commission to create a…

Ted Baker

As part of the developing relationship with MITIE and t…

USAF in the UK with McAndrewMartin

McAndrewMartin have been commissioned for many projects…

Whitehall FCO – Café upgrade

Proposed upgrade for Café in Foreign and Commonwealth o…

East Anglian Reserve Forces & Cadet Association (EARFCA) – New Accommodation Block

EARFCA – Waterbeach, Cambridgeshire new accommodation b…

Dept for Transport Asset Validation Survey, UK South

McAndrew Martin were commissioned by the departments pr…